|
|
Chrysler Plant # 2 Renovation
Huntsville, AL |
(click above for larger image)
|
Services provided for the rehabilitation of this early 1970''s facility consisted of specifications for design and construction for eight separate "packages" which included the following: renovation and upgrades of restrooms, lobby, kitchen/serving and security system; metal re-clad of entire exterior; boiler system and HVAC upgrades; replacement of potable water loop; cooling tower addition and replacement and structural retrofit; parking lot addition; and E.P.A. pit for process waste-water sampling flume.
|
|